Construction Investment Loans: What Not to Do

Building an investment property in Waterford, Queensland means managing drawdowns, tax timing and lender rules from day one. Here are the mistakes to avoid.

Hero Image for Construction Investment Loans: What Not to Do

The most costly mistake with an investment construction loan is treating it like a standard purchase loan. A build is funded in stages, the tax rules differ from an established property, and each lender sets its own terms.

This article is for investors in Waterford, Queensland who are weighing up a new build to rent out. It covers the errors that cause delays, extra cost or tax surprises, so you can plan before you sign a building contract.

What Not to Do: Assume the Loan Is Paid Out in One Lump Sum

A construction loan is paid out in stages as the build progresses. Lenders commonly charge interest on the drawn balance, but confirm this in your lender's terms rather than assuming it.

The number of drawdowns, the repayment type during the build, time limits, inspection requirements, fees and rates are all set by each lender. They are not set by a single national rule. Compare these terms before you commit, because lenders may charge fees and set time limits that suit your builder less well.

The trade-off is that interest costs can rise as more of the loan is drawn. Budget for a higher holding cost towards the end of the build. Our construction loans page explains how we can access options from a range of banks and lenders.

Why Progress Payments Must Match the Work Completed

In Queensland, progress payments must be relative to the work completed, so you should never pay a builder ahead of the build. The deposit limit is 5 per cent for contracts of $20,000 or more, or up to 20 per cent where off-site work is more than half the contract price.

A builder also cannot claim more than 50 per cent of the contract price, including the deposit, until at least half of the on-site work is complete. The number and timing of payments are negotiated. Payments made early or above the contract amount can reduce your protection under the Queensland Home Warranty Scheme.

When your lender releases funds, the amounts should line up with the stages in your fixed price building contract. If a builder asks for a payment that does not match the stage reached, raise it before anything is paid. Check any contract with a solicitor before signing.

Do Not Ignore the Serviceability Test During a Build

Lenders assess your ability to repay before approving a construction loan, even when the build itself is treated differently by some rules. An authorised deposit-taking institution must test repayments at an interest rate at least 3 percentage points above the loan rate, and APRA confirmed that buffer remained in place on 28 May 2026.

The debt-to-income limit that applies to a bank's overall lending does not apply to finance for constructing new dwellings. That exemption does not remove the serviceability assessment. Your income, existing debts and living costs are still assessed.

It also helps to know your numbers before you choose a design. Our borrowing capacity page is a sound starting point, and you can test repayments with the mortgage repayment calculator.

Ready to chat to one of our team?

Book a chat with a Mortgage Broker at Wagstaff Finance today.

How Repayments During Construction Work in a Scenario

The repayment type during the build is set by each lender, so check your lender's own requirement. As an example, if repayments are interest-only on the drawn balance, the repayment steps up as each stage is paid.

Consider an investor in Waterford, Queensland with a $600,000 construction loan, at an illustrative rate of 6.75% p.a. Early in the build, the foundation stage draws $60,000. Interest on that drawn balance is about $4,050 a year, or roughly $338 a month ($60,000 x 6.75% / 12).

By the time $450,000 has been drawn, interest on the drawn balance is about $30,375 a year, or about $2,531 a month. That is about 7.5 times the first stage repayment. At the full $600,000 draw, interest would be $40,500 a year, or $3,375 a month, which is the peak. An investor who budgeted only for the first stage would be caught short.

A sounder plan is to set aside a buffer for the later stages and check cash flow against the peak drawn balance. The trade-off is that you carry the cost of holding the loan while there is no rent coming in.

Tax Mistakes: Interest on Land and Construction Loans

The ATO treats interest on land and interest on construction differently while the land is vacant. A deduction cannot be claimed for holding costs of vacant land incurred on or after 1 July 2019, and this includes interest on money borrowed to buy the land.

Holding costs do not include interest on borrowings associated with constructing the building. In the ATO's example, a buyer with one loan for land and a separate loan for the construction of a house to rent out can claim the construction loan interest, but not the land loan interest, while the land remains vacant. Where one loan funds both, the interest must be apportioned.

This is why loan structure matters before the first drawdown. Ask your accountant how to set up the split, as the right outcome depends on your circumstances and no tax result is certain. Our investment loans page covers how we approach structuring for investors.

Negative Gearing and Capital Works: Know the Rules for New Builds

The Australian Government states that new builds can continue to be negatively geared before and after 1 July 2027. From 1 July 2027, losses on established residential property bought after 12 May 2026 face a new limit. How this applies to land bought after 12 May 2026 and built on under a separate contract has not been confirmed, so get tax advice before you buy land.

Capital works deductions are generally available at 2.5 per cent a year for 40 years on a residential building where construction started after 15 September 1987. Claims start only when construction is completed and only for periods the property is used to produce income.

From 1 July 2027, investors who buy new builds can choose either the existing 50 per cent CGT discount or the new inflation-based arrangement, which comes with a minimum 30 per cent tax rate on gains. Get tax advice before deciding. These rules may change.

Do Not Forget the 5% Deposit Scheme Does Not Support Investors

The Australian Government 5% Deposit Scheme does not support investment properties, because it is an owner-occupier loan. Do not plan a deposit strategy around it if the home is to be rented out.

A larger deposit lowers your loan-to-valuation ratio, which may reduce or remove the need for lenders mortgage insurance. Check the threshold with your lender. Talk through your deposit and cash buffer with a broker before you choose a land and construction package.

Call one of our team or book an appointment at a time that works for you. We can talk you through construction finance options for your Waterford, Queensland build before you sign anything.

Frequently Asked Questions

Do I pay interest on the full construction loan from day one?

Lenders commonly charge interest on the amount drawn down so far, but confirm this in your lender's terms. Repayments can rise as each stage of the build is paid, and lender terms vary.

Can I claim interest on a construction loan for an investment property?

The ATO states that interest on borrowings associated with construction is not treated as a vacant land holding cost. Where one loan funds both land and construction, the interest must be apportioned, so speak to your accountant.

Can I use the 5% Deposit Scheme to build an investment property?

No. Housing Australia states investment properties are not eligible for the scheme, which is for owner-occupier home loans.

How much deposit can a Queensland builder ask for?

For contracts of $20,000 or more, the maximum deposit is 5 per cent. It can be up to 20 per cent where off-site work is more than 50 per cent of the contract price.